Questions and next steps

Costs, quotes, and providers

Inspection and repair costs, quote preparation, qualifications, provider selection, conflicts, and how BIQ can support you with your inspection or repair project

45 FAQs
Browse by topic

How do I verify a repair contractor’s license?

Check the general license first, then the specialty classifications for the repair.

Class B General Building

Class B can cover framing and carpentry. Other contracts must meet its trade-count, additional-license or specialty-subcontracting rules.

Wood framing plus waterproofing does not automatically satisfy the two-trade rule. Framing and carpentry are excluded from that count. (1)

Class A General Engineering

Class A covers specified engineering works. If a bidder offers only Class A for a building’s balcony, stairway, deck or walkway repair, ask CSLB to confirm that the complete scope is covered. (2)

Specialty classifications

Compare the written scope with the contractor’s classifications:

  • Wood framing and exterior stairway carpentry: C-5.
  • Structural steel: C-51.
  • Concrete: C-8.
  • Separately contracted reinforcing steel: C-50.
  • Waterproof membranes: C-39.

Check additional classifications for coatings, flashing, railings, tile or masonry when those trades are included.

A B-2 Residential Remodeling license does not authorize structural changes to load-bearing parts. (3)

Check the official record

Use the California Contractors State License Board’s license lookup. (4)

  1. Enter the contractor’s license number.
  2. Match the business name to the quote and contract.
  3. Confirm that the license is active.
  4. Check that its classifications cover the assigned work.
  5. Review the bond, workers’ compensation information and any disclosed disciplinary information.
  6. Repeat the check for specialty subcontractors.

For an unusual repair or an unclear classification, give CSLB the written scope and ask for guidance before signing.

Related questions

Sources
Link to this answer

What is myPROJECT?

myPROJECT is your private BIQ project record for an inspection or repair quote request. It guides you step by step as you add your property details, the work you need, access information, reports, photos, and provider choices. You can start with what you know, save the record, and return to it later. After your first save, you can use your private continuation link to add information from your phone or another device.

Saving myPROJECT does not send a request to providers. You review your details and decide when to submit. BIQ then uses the information you approved to contact the selected providers and coordinate the request. If you confirm new information for a submitted request, BIQ alerts the participating providers. BIQ's request preparation and coordination are free; providers charge for their inspection or repair services. BIQ does not perform those services or guarantee a provider response.

For the full step-by-step process, read how BIQ helps you prepare and manage a quote request. When you are ready, start myPROJECT.

Link to this answer

How do I compress photos and videos for myPROJECT?

Save a smaller copy of each file and keep the original. Aim for under 8 MB per photo and under 75 MB per video. Use the limit shown in myPROJECT if it is lower. Check the size of the exported copy before uploading it.

Keep photos under 8 MB

  1. For new photos, use your phone’s standard photo mode. Take one wide shot to show the location and one close-up to show the detail.
  2. For an oversized photo, export a JPEG copy. If it is still too large, resize it with the proportions locked. About 2,400 pixels on the long edge is a starting point for an ordinary property photo. On a Mac, open the photo in Preview. Choose Export from the File menu to select JPEG and adjust quality. Choose Adjust Size from the Tools menu to reduce dimensions. In Windows Paint, use Resize and save a JPEG copy. (1) (2) (3)
  3. Open the copy and zoom in. Check that cracks, fasteners and any labels are still clear. For a site plan or annotated image, keep a PNG copy if it fits and keeps the labels sharper.

Keep videos under 75 MB

  1. For new recordings, start at 1080p and 30 frames per second if your phone offers those settings. Film one area at a time. Short clips of 15 to 30 seconds are easier to keep small and review. (4)
  2. For a video you already have, trim the beginning and end and save a copy. On iPhone, open the clip in Photos and tap Edit. On Android, use the trim handles in Google Photos. Split a long walk-through into clips named by building or feature if you need the full footage. (5) (6)
  3. If a clip is still too large, export it at 720p, then check its size. On a Mac, open the clip in QuickTime Player, choose Export As from the File menu, and select 720p. On Windows, choose 720p when exporting from Clipchamp. Play the exported clip to check the important details and narration. If a small detail is hard to see in the video, include a separate close-up photo. (7) (8)

Related questions

Sources
Link to this answer

How BIQ can help you prepare, save and manage your inspection or repair quote request

One myPROJECT. One clear request. No need to start again for every provider.

Balcony Inspection Quotes (BIQ) helps you collect the information that inspection or repair providers need in myPROJECT, your saved project record. A guided process takes you from the first property details to a structured request for quote (RfQ). You can add information in stages, BIQ always automatically saves your progress and allows you to return and continue when you have more details.

The aim is simple: give providers a clear, consistent description of your project so they can prepare more complete quotes. You spend less time repeating the same facts and more time comparing what each provider offers.

BIQ's quote request preparation and coordination are free.
Inspection and repair providers charge for their services.

1. Start with what you need

Select the route that fits your situation:

  • An inspection quote request, including an SB 721 or SB 326 inspection where applicable.
  • A repair quote request based on an existing inspection report.
  • A repair quote request without an inspection report.
  • Help to understand which inspection requirements may apply.

You do not need a complete set of records before you start. The questions help you identify what you already know and what you still need to find.

2. Build one clear picture of your property

BIQ guides you through the details that matter for your chosen route. These can include:

  • Your role, such as property owner, property manager or HOA board member.
  • The property location and type.
  • The buildings, dwelling units and structures involved.
  • The balconies and other types of Exterior Elevated Elements (E3), such as decks, stairs and walkways, that need attention.
  • Your reason for requesting an inspection or repairs.
  • Existing reports, known damage, access restrictions and other concerns.
  • Your timing needs and arrangements for site access.

You answer the relevant questions step by step. Where an unknown answer is allowed, record it as unknown. Do not invent a measurement, condition or finding just to complete a field.

3. Add reports, photos and other useful details

For a repair request based on a report, use its findings to explain the work you want providers to consider. Where the form offers uploads, add useful reports, photos or videos to support your description.

You can return with more information as you obtain it. A clear image, a report finding or an access detail can help a provider understand work that a short description alone cannot explain.

4. Save your progress and return later

BIQ automatically saves your progress and provides you a with a private edit/continuation link that allows you to access your myPROJECT from multiple devices. Take picture or videos on your phone and seamlessly add them to myPROJECT. To save your myPROJECT with BIQ:

  1. Select Save myPROJECT in the form.
  2. Give the record a name that you will recognize.
  3. Enter your email address and confirm the displayed saving permission.
  4. Wait for the myPROJECT saved confirmation.
  5. Keep the private continuation link. BIQ sends the link also to your email address.

Use the private continuation link to return to the saved myPROJECT, including from another device. A browser-only draft does not move to another device by itself. Keep the link private because it allows access to your project information. Saved drafts have a limited retention period; complete yours within the period shown by BIQ.

Saving your progress does not send your request to providers. You can keep preparing until you decide to request quotes.

5. Complete the details needed for your request

The form shows missing required information so you can address it before submission. You can review earlier answers, correct details and add information as your project becomes clearer.

The goal is a useful request, not a collection of guesses. A provider may still need to ask questions, inspect the property or confirm the work before giving a final price.

6. Choose how you want to obtain quotes

BIQ starts with Fast Quote, an exclusive request with one active provider.

If you want competing quotes, select Competitive Quote and choose two to five providers. We recommend three: enough for a useful comparison without too many proposals to assess.

The provider-choice section lets you identify providers or ask BIQ to select them, subject to the available options. Check your selection and the information-sharing permissions before you submit.

7. Review once, then let BIQ coordinate the request

Review the property details, requested work, provider choices and permissions. When you are ready, submit your request.

BIQ uses your structured project information to contact providers for you and helps coordinate the site visits your project needs. Participating providers receive the same confirmed project information within your sharing choices. You do not need to recreate the property description for each provider.

8. Keep participating providers informed when facts change

Return to myPROJECT when you have additional information or need to correct a detail. For example, you may obtain a report, clarify the number of affected structures or change an access arrangement.

For a request already submitted, review and confirm the update for sharing. BIQ then notifies participating providers about the confirmed changes. Saving draft edits alone does not send those changes to providers.

This helps providers work from the same current facts and reduces repeated explanations.

What does this help me achieve?

A well-prepared myPROJECT gives providers a clearer basis for their quotes. It also gives you a common starting point when comparing the proposed work, exclusions, site visits and prices.

BIQ helps you prepare and coordinate the request. BIQ does not perform inspections or repairs and does not guarantee quotes or provider responses. Each provider remains responsible for their proposed services and price.

Start with the details you have. Build a clearer request one step at a time.

Start myPROJECT

Related questions

Link to this answer

What affects the cost of a balcony inspection?

The price depends on the number and type of structures, their height, access and the checks needed. Opening covered areas and repairing those openings can add cost. Ask for a written price that states what the inspection and report include. BIQ's quote request coordination is free; providers charge for their services.

Start myPROJECT

Related questions

Link to this answer

What affects an SB 326 inspection quote?

The number and types of covered structures affect the required sample and site work. Access, concealed areas and report requirements also affect cost. Ask whether openings, restoration and board meetings are included. Use the same written scope when comparing providers.

Start myPROJECT

Related questions

Link to this answer

Can a missing SB 721 or SB 326 inspection report affect getting or renewing building insurance?

Yes, if the insurer needs the report to assess your property. Your application or renewal can be delayed while you obtain inspection or repair records. If you cannot meet the insurer's lawful requirements, it may decline a new policy or refuse renewal. The outcome depends on the insurer, policy and applicable rules. (1)

Refusing renewal when a policy expires is different from cancelling cover during its term. Ask your insurer or licensed broker which documents it needs and by what date. Obtain its requirements in writing. An inspection does not guarantee insurance or a lower price. (1)

For a condominium, distinguish the HOA's building policy from your own unit policy. They cover different interests and can have different requirements. (2)

If records are missing, follow the steps for finding inspection and repair records.

Related questions

Sources
Link to this answer

Is an SB 721 inspection priced only by apartment count?

No. Apartment count helps describe the property, but the number and type of raised structures also matter. Height, access and hidden conditions affect the work. Ask for a written scope and charges for possible extra checks. See the main price factors.

Start myPROJECT

Related questions

Link to this answer

Can I calculate my balcony's safe load from its floor area?

No. Multiplying area by a general code value does not establish an existing balcony's safe capacity. Connections, materials, decay and concentrated weight all matter. A structural engineer can assess the design and condition. Ask before adding heavy planters, storage or equipment. Read why stored weight creates risk.

Related questions

Link to this answer

How can I obtain a useful SB 721 inspection price?

Provide the dwelling count, types and numbers of raised structures, access details and previous reports. Ask for the sample, report and possible extra checks to be priced clearly. Then compare the same scope across providers. You can start myPROJECT to organize the request.

Related questions

Link to this answer

Can a missing balcony inspection report stop a condo buyer's mortgage or my refinance?

It can prevent approval under a particular loan program. Under Fannie Mae's project-review rules, lenders must obtain and review structural or mechanical inspection reports completed within the previous three years. Its guidance says loans are not eligible for sale to Fannie Mae if the lender cannot obtain required reports or establish that the project meets the relevant condition requirements. This can affect purchases and refinancing. (1)

This does not mean every condo needs a new inspection for every mortgage. Fannie Mae permits review of other information when no inspection was completed. State inspection duties still apply separately. (1)

Unresolved critical repairs can also make a project ineligible. These are repairs that materially affect safety, structural condition, habitability or other criteria in the loan rules. Ask the lender about the exact property and loan program. (2)

See the condo seller's disclosure duties and the steps for gathering missing records.

Related questions

Sources
Link to this answer

Which details most affect an inspection price?

The number and types of structures, their height, access and hidden areas affect site work. Required methods, reporting and restoration of openings affect the rest. A rushed date or extra visit may also change a quote. Ask what is included before comparing totals.

Start myPROJECT

Related questions

Link to this answer

What affects the price of a deck inspection?

The deck's size, height, access, construction and condition affect the work. A simple condition check differs from a statutory inspection or engineering assessment. Ask which service you are buying and what report you receive. See the inspection price factors.

Start myPROJECT

Related questions

Link to this answer

Can using one firm for inspection and repairs save money?

It may make coordination easier, but it does not guarantee a lower total price. Check the inspection qualifications, repair license for the work, written scope and any financial connection before you choose a firm.

Can the same firm inspect and carry out repairs?

For SB 721: A contractor who meets the inspection requirements can also carry out repairs if they meet the repair requirements. SB 607 removed the original restriction on the inspecting contractor performing repairs. Necessary permits, the correct qualifications and local requirements still apply. (1) (2)

For SB 326: The inspection must be conducted by a licensed architect or licensed civil or structural engineer. A contractor's licence alone does not qualify someone to perform that inspection. Civil Code section 5551 does not itself require two unrelated firms, but the inspection professional and repair contractor must each meet the rules for their work. Other professional and local requirements still apply. (3)

Read who can perform SB 721 and SB 326 inspections.

Why does the financial connection matter?

A conflict of interest can arise when an inspector can earn money from the repairs they recommend. This connection may affect their judgment about how much work is needed.

Ask whether the inspector owns, works for, or receives a financial benefit from the proposed repair business. Ask for the answer in writing.

For licensed engineers, a business connection or financial interest that may influence their professional judgment must be fully disclosed in writing to their client or employer. (4)

What should I compare before I agree to repairs?

Ask for:

  • The name and licence or certification of the person responsible for the inspection.
  • The written inspection report and a repair proposal that lists the work and its price.
  • Separate prices for the inspection and repairs.
  • The name and license classifications of the repair contractor, and any connection to the inspector.
  • The required permits, who will arrange them, and any follow-up inspections included in the price.

Compare quotes for the same repair work, including what each quote leaves out. A bundle discount alone does not show that the total price is competitive.

Before a substantial repair commitment, consider a review by a separately appointed, appropriately qualified professional. This is an additional safeguard when buying services, not a general rule that every project must use two unrelated firms.

Use the official directories to check an architect license with CAB (external site) or check a civil or structural engineer license with BPELSG (external site). For contracting or repair work, check a contractor license (external site).

Start myPROJECT

Related questions

Sources
Link to this answer

What qualifications matter beyond a provider's job title?

How do I choose a deck coating?

Choose a product approved for the deck's material, use and existing system. A coating for a roof may not suit a surface people walk on. Check drainage, slip resistance and the maker's installation instructions. A new coating cannot repair weak supports. Read what waterproofing does.

Related questions

Link to this answer

When should I receive the inspection report?

Ask the provider for a written delivery date. SB 721 requires the report within 45 days after the inspection is complete. Hazard-reporting duties can apply sooner. Do not assume every provider or law uses a 14-day promise. Confirm the required report contents and the provider's scope.

Related questions

Link to this answer

Should a manager wait for the final report before acting on danger?

No. A known immediate danger requires prompt protective action. Keep people away, notify the responsible owner or board and obtain qualified help. The later report records the findings; it does not justify delaying protection. See the immediate-hazard steps.

Related questions

Link to this answer

How should I prepare for a balcony inspection?

Gather past reports, repair records and available building plans. Tell the provider about leaks, movement and restricted areas. Arrange safe access and notify residents as required. Clear requested items only where it is safe. Do not paint over or hide damage. Ask what the visit includes.

Start myPROJECT

Related questions

Link to this answer

Can I put plants on a condo balcony?

Check the association's rules and the structure's capacity first. Planters can become much heavier when soil is wet. Keep drainage and access clear, and prevent water from collecting against supports. Do not attach heavy pots to rails without approval. See balcony weight limits.

Related questions

Link to this answer

What information should I give the inspector before the visit?

Provide the address, dwelling unit count, structure types/count/location, prior reports and repair records. Describe known leaks or safety concerns and explain access arrangements. This helps the provider plan the work and price it accurately. Read the site preparation steps. BIQ's quote preparation process helps you with compiling a professional quote request. Read how BIQ works and Start myPROJECT

Related questions

Link to this answer

Should I repair or paint visible defects before an SB 721 inspection?

Tell the inspector about defects before changing or covering them. Do not hide signs that help show the cause and extent of damage. Immediate safety concerns still need prompt protective action. Gather records and arrange safe access using the inspection checklist.

Related questions

Link to this answer

Should I repair a balcony before its required inspection?

Sometimes. First protect people if a balcony, deck, stair or walkway may be unsafe. Record the condition and arrange an assessment of the existing structure and proposed repairs. Select repair contractors for the wood, steel or concrete work. If the defect and repair scope are already clear, a properly planned repair before the scheduled inspection may help you avoid rushed work later. If the cause or extent of damage is unclear, an assessment first may prevent you from paying for the wrong repair. Do not cover a defect or delay a required inspection to make the report look better. A repair does not replace an SB 721 or SB 326 inspection for a covered property. (1) (2)

Compare both paths in the repair-before-inspection guide.

Related questions

Sources
Link to this answer

Does a repair remove the SB 721 inspection requirement?

No. If your apartment property is covered by SB 721, a qualifying inspector must still inspect the required sample of Exterior Elevated Elements (E3). The law requires at least 15 percent of each type of E3 in the sample. Repair records can help the inspector understand earlier work, but they do not replace the inspection report. Tell the inspector what was repaired, when, and under which permits. See the repair-before-inspection guide before you schedule work. (1)

Related questions

Sources
Link to this answer

What follow-up inspection is needed after an SB 721 or SB 326 repair?

An ordinary repair does not automatically require another full SB 721 or SB 326 inspection. The required follow-up depends on the finding and local permit rules. For SB 721, an emergency repair must be inspected by the inspector and reported to the local enforcement agency. For SB 326, if an inspection finds an immediate threat, the affected element stays closed until the local enforcement agency inspects and approves the repair. Other repairs may need permit inspections or additional checks under local rules. A contractor's statement that the work is complete does not replace a required outside check. Ask the inspector and local building department what proof of completion they need. (1) (2)

See the repair-before-inspection guide for the decision before work starts.

Related questions

Sources
Link to this answer

Can an HOA repair a balcony before its SB 326 inspection?

Yes, when the HOA has a sound repair plan and follows the applicable permit and safety rules. But an early repair does not replace the SB 326 inspection of a covered condominium project. If damage is hidden or the cause is unknown, the HOA may pay for work that does not solve the problem. Record the original condition, arrange an assessment by the appropriate licensed professional when needed, keep the repair records, and tell the inspector what changed. Do not let repair work delay an inspection that is due. If an inspector later finds an immediate threat, access must stay restricted until the local enforcement agency inspects and approves the repair. (1)

Compare the choices in the repair-before-inspection guide.

Related questions

Sources
Link to this answer

Can I estimate a balcony project by cost per square foot?

Area can help compare similar projects, but it is not enough for a reliable total. Design work, support changes, access, permits and water protection may dominate the cost. A small complex balcony can cost more than a larger simple one. Ask for an itemized quote based on your property.

Related questions

Link to this answer

How much does it cost to build a balcony in California?

There is no single useful price for all properties. Size, support design, access, permits, materials and work on the existing building affect the total. Published price ranges may omit major items. Give providers the same project details and compare written scopes, including exclusions.

Related questions

Link to this answer

Is a Juliet balcony the cheapest balcony option?

A Juliet balcony is usually a protective railing at a door, without a usable platform outside. It may need less work than a walk-out balcony, but it serves a different purpose. Price depends on the opening and required support. Confirm design and permit needs before comparing options.

Related questions

Link to this answer

Who may perform an SB 721 inspection?

Under SB 721, the building owner can hire one of these professionals (1).

  • A California-licensed architect. (2)
  • A California-licensed civil or structural engineer. (3)
  • A contractor with an A, B, or C-5 license and at least five years of experience building multistory wood-frame buildings while holding a qualifying license. (4)
  • A certified building inspector with ICC B5 or an equivalent certification the local jurisdiction accepts. (5)
  • A certified building official with ICC CB or an equivalent certification the local jurisdiction accepts. (5)

Confirm with the local jurisdiction that it accepts the certification and recognizes the issuing association. The jurisdiction cannot employ the inspector while they perform the inspection.

Ask who will inspect the building and sign or stamp the report.

Start myPROJECT

Related questions

Sources
Link to this answer

Can my handyman perform the required balcony inspection?

Only if that person separately meets the legal qualification rules for the inspection. General repair experience alone is not enough. SB 721 and SB 326 have different requirements. Check the permitted SB 721 qualifications or the SB 326 qualifications before you book.

Related questions

Link to this answer

Who is qualified to perform SB 721 and SB 326 inspections?

Both laws allow either of these licensed professionals (1) (7).

  • A California-licensed architect (2).
  • A California-licensed civil or structural engineer (3).

SB 721 also allows two other routes. A contractor needs an A, B, or C-5 license and at least five years of experience constructing multistory wood-frame buildings while holding a qualifying license (4). The certification route covers a certified building inspector or certified building official, subject to local acceptance. South San Francisco’s balcony inspection guide lists these certifications (6).

  • Certified building inspector with ICC B5 or equivalent (5).
  • Certified building official with ICC CB or equivalent (5).

For the SB 721 certification route, confirm that the local jurisdiction accepts the certification and recognizes the issuing association. The inspector must not be employed by that jurisdiction while performing the inspection.

Compare the SB 721 requirements and SB 326 requirements.

Start myPROJECT

Related questions

Sources
Link to this answer

Who may perform an SB 326 inspection?

Under Civil Code § 5551 (1), one of these licensed professionals must perform the SB 326 inspection.

  • A California-licensed architect (2).
  • A California-licensed civil or structural engineer (3).

Ask who will inspect and sign or stamp the report.

Start myPROJECT

Related questions

Sources
Link to this answer

What should I check before hiring an SB 721 inspector?

Ask who will inspect the building and sign or stamp the report. Request their license or certification number, experience with similar buildings, and written inspection scope. For a contractor, confirm the A, B, or C-5 class and at least five years of qualifying experience. For a Certified Building Inspector or Certified Building Official, confirm local acceptance. See the certification requirements.

Use the official directories to check a contractor license with CSLB (external site), check an architect license with CAB (external site), check a civil or structural engineer license with BPELSG (external site), or verify an ICC certification (external site). (1)

Start myPROJECT

Related questions

Sources
Link to this answer

Can a certified building inspector perform SB 721 inspections?

Yes, if the certification meets the local jurisdiction’s requirements. South San Francisco’s balcony inspection guide (external site) lists these certifications:

  • Certified Building Inspector, ICC B5 or equivalent.
  • Certified Building Official, ICC CB or equivalent.

For the SB 721 certification route, confirm that the local jurisdiction accepts the certification and recognizes the issuing association. The inspector must not be employed by that jurisdiction while performing the inspection.

Verify the ICC certification (external site). If the person presents an equivalent certification, confirm it with the issuer and the local jurisdiction. See Health and Safety Code § 17973 (external site) (1).

Related questions

Sources
Link to this answer

Can any licensed contractor perform an SB 721 inspection?

No. The contractor route requires an A, B or C-5 license and at least five years of relevant licensed experience. That experience must be in multistory wood-frame construction. Other permitted professional routes also exist. Read the full inspector requirements; do not rely on “licensed contractor” alone.

Check the contractor’s license and class with CSLB (external site).

Related questions

Link to this answer

Can my regular home inspector perform an SB 326 inspection?

Only if the person also has the required California architect, civil engineer or structural engineer license. A home-inspector certificate alone is not sufficient. Ask who will perform and take responsibility for the inspection. Check the current SB 326 qualification rule (external site) (1).

Use the official directories to check an architect license with CAB (external site) or check a civil or structural engineer license with BPELSG (external site).

Related questions

Sources
Link to this answer

Can a handyman make repairs after an inspection?

For corrective work identified in an SB 721 report, hire a contractor licensed for the repair scope. The term "handyman" does not identify a license or its permitted work.

A Class B General Building contractor can take wood framing or carpentry work. The specialty routes include C-5 for wood framing and exterior stairways, C-51 for structural steel and C-8 for concrete. Class B contracts involving other trades must meet the additional license and subcontracting rules. Match the license to each repair material, and obtain required permits.

Use the report and approved plans to define the job. Check the contractor through the state license lookup (external site) (1) before signing.

Start myPROJECT

Related questions

Sources
Link to this answer

Does a home-inspector certificate alone qualify someone for SB 721?

Not automatically. The person must meet one of the law's permitted qualification routes. The certified-inspector route also depends on recognition by the local jurisdiction. Ask for proof before booking. Read the full SB 721 qualification requirements (external site) (1).

Verify the ICC certification (external site) and see local certification requirements.

Related questions

Sources
Link to this answer

What should I do if my balcony inspection report or repair records are missing?

First establish whether the inspection was completed. A lost report, a missed inspection and unfinished repairs are different problems. Use these steps to find out what needs attention.

  1. Ask for the signed report. Contact the owner, HOA manager, previous manager or original inspector. Check available local records, but do not assume the local authority holds every report.
  2. Collect the related records. Gather later findings, repair details, relevant permits, evidence of completed work and any professional confirmation that repairs are complete. For an HOA, also ask about repair funding and special assessments. Lenders may need several types of records to assess a project. (1)
  3. Ask what the recipient needs. An insurer, buyer and lender may request different documents. Confirm the required documents and delivery date directly with each party. (1) (2)
  4. Address any inspection or repair gap. If a required inspection was never completed, arrange the correct inspection. If repairs remain open, establish the next steps with the appropriate professional. Do not describe the property as compliant without an adequate basis.
  5. Prepare a clear request for help. BIQ can help you gather project details and prepare an inspection or repair quote request in myPROJECT. Read how myPROJECT works, or start myPROJECT.

BIQ cannot replace the inspector's report or the insurer's or lender's decision. See how records affect insurance, apartment-building sales and condominium sales.

Related questions

Sources
Link to this answer

How do I verify an SB 721 inspector's relevant experience?

Ask for examples of comparable buildings and who will perform the work. For the contractor route, confirm the permitted license and required licensed experience in multistory wood-frame construction. Verify credentials independently. See the qualification checklist.

Use the official directories to check a contractor license with CSLB (external site), check an architect license with CAB (external site), check a civil or structural engineer license with BPELSG (external site), or verify an ICC certification (external site).

Start myPROJECT

Related questions

Link to this answer

Who should assess a balcony before renovation?

Start with a Class B General Building contractor experienced in the proposed repair, subject to the license rules for the work. For individual trades, the relevant specialties include C-5 for wood framing and exterior stairway carpentry, C-51 for structural steel, and C-8 for concrete. Compare the licenses for each material and element. For leaks, coatings or membranes, use the waterproofing contractor guidance.

If changes affect load-bearing supports or the structure's capacity, ask a California-licensed architect, civil engineer or structural engineer to assess the design and existing condition. Structural changes may need engineered plans. Verify an architect's license (external site) or an engineer's license (external site).

Explain the intended use, materials and any damage. If you have no report, read how to arrange repairs before an inspection. A required SB inspection has its own inspector credential rules.

Related questions

Link to this answer

Who should perform a fire escape inspection?

Use a professional whose qualifications the local fire or building authority accepts for that service. Ask about experience with metal structures, corrosion, connections and any required testing. A general balcony inspection credential does not establish this automatically. Confirm the fire escape scope.

Related questions

Link to this answer

How should an HOA verify its SB 326 inspector?

A California-licensed architect, civil engineer, or structural engineer must perform the SB 326 inspection. Use the official directories to check an architect license with CAB (external site) or check a civil or structural engineer license with BPELSG (external site). Ask about similar buildings, the proposed sample, and who will sign or stamp the report. SB 326 qualifications

Start myPROJECT

Related questions

Link to this answer

Which contractor licenses cover wood, steel, and concrete exterior elevated element repairs?

There are three contractor license categories: Class A General Engineering , Class B General Building, and Class C Specialty Licenses. Your contractor’s license must cover the actual repair scope/contract. For an Exterior Elevated Element (E3), check the project, the work and the materials. A Class A license and a Class B license cover different kinds of projects.

When can a Class A license cover the repairs?

Class A General Engineering covers fixed works that need specialized engineering knowledge, such as bridges, roads, docks and similar projects. An A-only contractor can contract for all or part of a project within that scope. The California Contractors State License Board (CSLB) also allows individual trade work when it was originally, or is currently, part of such a project. (8) (9)

For example, concrete repair to a walkway that is part of a qualifying bridge project can fall within Class A. The connection to that project must be established. Steel or concrete materials alone do not make an apartment balcony, deck or exterior stairway a Class A project. This example applies CSLB’s scope rule; it is not approval of a particular repair. (8) (9)

If the repair is outside Class A’s scope, an A-only license does not cover the contract. Select a business that holds an applicable Class B or specialty classification for that work. An A contractor can hold those additional classifications. Hiring a specialty subcontractor does not, by itself, bring an out-of-scope contract within Class A. If the scope is unclear, ask CSLB to review the written description before you sign. (8) (9)

When does Class B cover a building repair?

Class B General Building is a common route for a building repair involving several trades. It can also cover a framing or carpentry contract on its own. For a contract directly with the owner that includes other trades, the contractor must meet at least one of these conditions: (1)

  • The work needs at least two unrelated trades other than framing or carpentry.
  • The business also holds the appropriate specialty classification.
  • The business subcontracts the specialty work to an appropriately licensed specialty contractor.

Framing or carpentry does not count toward that two-trade minimum. For example, wood framing plus waterproofing alone does not meet it. A Class B contractor taking a subcontract for a single specialty trade must hold that specialty classification; passing the work to another subcontractor is not enough. (1)

Which specialty classifications cover each material?

For individual trades, use the material and the actual work to identify the relevant specialty classification. The table shows specialty routes. Class A or Class B can also cover work where the scope rules above are met.

ElementWood framing or carpentryStructural steel workConcrete work
BalconyC-5C-51C-8
DeckC-5C-51C-8
Exterior stairwayC-5C-51C-8
Stairway landingC-5C-51C-8
Elevated walkwayC-5C-51C-8
Porch or entry structureC-5C-51C-8
Posts, beams and other supportsC-5C-51C-8 for concrete supports and footings

The classifications are:

  • C-5 Framing and Rough Carpentry: Wood framing and its components, including exterior staircases and railings. (2)
  • C-51 Structural Steel: Structural steel shapes and plates, including the welding and related work needed for their installation. (3)
  • C-8 Concrete: Forming, placing and finishing concrete work. (4)
  • C-50 Reinforcing Steel: Fabricating and placing steel bars or mesh that reinforce concrete. This is relevant when that work is contracted separately. A concrete repair does not automatically require a separate C-50 contractor. (5)

Other parts can need different classifications:

  • Wood railings: Class B carpentry or C-5.
  • Ornamental metal railings: C-23 Ornamental Metal, within its scope.
  • Waterproof membranes: C-39 Roofing.
  • Sheet-metal flashing: C-43 Sheet Metal.
  • Tile finishes: C-54 Ceramic and Mosaic Tile.
  • Brick, block or stone work: C-29 Masonry.

A C-61/D-41 Siding and Decking contractor can also construct wooden decks and related handrails within that classification’s limits. (6)

A steel stairway with concrete treads can involve both steel and concrete work. Ask the bidder to identify who will perform each part, including connections, reinforcing steel and waterproofing.

Verify every contracted business through CSLB. (7)

Related questions

Sources
Link to this answer

Ready to describe your project?

Your saved project details stay in this browser when you move between these pages.