HOAs and condominiums

SB 326 balcony inspections

California law requires boards of covered condominium associations to arrange inspections of certain balconies, decks, stairs and walkways. The inspection checks the parts that support these structures and protect them from water. The board uses the report to respond to hazards, plan repairs and update its reserve study.

Which balconies, stairs and decks count?

Under SB 326, an Exterior Elevated Element, or E3, includes the load-bearing parts and the waterproofing that protects them. The structural parts extend beyond the exterior walls and transfer loads from decks, balconies, stairways, walkways and their railings back to the building. The structure must meet these conditions:

  • Its walking surface is more than six feet above ground level.
  • People are meant to use it.
  • Wood or wood-based products provide all or a substantial part of its support.

The surface can hide the frame below. Check the plans or have a qualified professional verify the support material. Read the SB 326 definition and check local rules for requirements that cover other structures or materials.

When is the inspection due?

  • Existing buildings

    The general first deadline was January 1, 2025. Repeat the inspection at least every nine years in coordination with the reserve study inspection. If the association missed its deadline, arrange the inspection promptly.
  • Newer buildings

    If the building permit application was submitted on or after January 1, 2020, the first inspection is due within six years after the certificate of occupancy. Check the property’s records and any stricter local rules.

Who can inspect and how do they select the sample?

The board must hire a California-licensed architect, civil engineer, or structural engineer. Use the official directories to check an architect license with CAB or check a civil or structural engineer license with BPELSG. Inspector qualifications.

Before the first inspection, the inspector creates a random list of the locations of each type of qualifying element the association maintains or repairs. The association keeps that list. At the next inspection, the inspector starts with the next element on the list and proceeds in order.

The sample must provide 95% confidence that the results reflect the full group, with a margin of error of no more than five percentage points in either direction. Ask the inspector to explain the inventory, sample size and selection method in the proposal. See how the SB 326 sample works.

The inspector starts with the least intrusive visual method needed to check the supports. That can include a moisture meter, a small camera or infrared imaging. If the inspector sees signs that water or water vapor entered the waterproofing system and could damage the supports, they decide whether and how to inspect further.

What happens after the inspection?

The inspector gives the board a signed or stamped written report. It identifies the parts inspected, their condition and remaining service life, immediate hazards, and recommended repairs or replacement. The first page must include the inspection date, counts for units and elements, any immediate threats and units affected, and certification that the sample met the law. The board incorporates the report into the reserve study, which helps the association plan and fund major repairs.
  • Immediate danger

    The inspector sends the report to the association as soon as it is complete and to local enforcement within 15 days after completion. The association must take preventive measures immediately. Keep occupants out until the local enforcement agency inspects and approves the repairs.
  • Repairs without immediate danger

    Use the report to set priorities, arrange repairs with contractors licensed for the materials and work and plan funding. SB 326 gives no fixed statewide number of days for completing these repairs. Confirm the schedule with the inspector and check for local permits or deadlines. Keep maintaining the elements between inspections.

Keep records for the board, owners and buyers

Keep the reports as association records for two inspection cycles. California’s 2026 disclosure rules require the seller in a covered resale to provide the most recent SB 326 report to the buyer. Association members can also request access to the retained reports. Keep the random list, repair records and permits available for the next board and inspection. Read about condo inspection records and sales.

What the board should gather before asking for quotes

Collect the governing documents, plans, element counts, prior inspection reports and reserve study. Identify where the inspector needs resident access or a lift. Use the same inventory and scope for every provider so the board can compare the prices and proposed methods. See the inspection quote checklist.

Plan your inspection budget

Ask each provider to price the sample, site access, any further investigation, the written report and follow-up visits. Ask what an extra opening costs and which qualified contractors will close and repair it afterward. Agree in writing on a report delivery date that gives the board time to act.

Prepare before you request a quote

Start with location, role, and known elements

Keep this short. Enter a California city or ZIP, choose the role or question, then add only the element categories you know.

0Total entered
0Elements to inspect
0Uploaded media

Counts should cover the project. The inspection count is the minimum number of elements to plan around for this request.

SB 721 planning count uses at least 15% of each same-type element entered here.
?

SB 721 uses ceil(total same-type elements x 0.15). SB 326 uses Z = 1.96, e = 0.05, and p = 0.5 when unknown. Section 604 and other request types use the total entered here. This is quote-planning support, not a final inspection plan or legal advice.

Health and Safety Code 17973Civil Code 5551San Francisco Section 604

Add only the categories you know. Leave unknown element types out for now.

Quote statusProvider quote needed
Inspected-count assumption0 of 0
Full-inventory count0
Show count assumptions
TypeEnteredEstimated inspected
Balconies00
Decks00
Stairs00
Landings00
Walkways00
Rails00
Fire escapes00

The count assumption is not a price. Public sources do not support a reliable market price for every element type yet. A real quote still depends on provider pricing, access, building layout, local process, reporting scope, and whether the inspector expands the sample.

This is not a provider quote, regulated fee schedule, market average, legal advice, engineering advice, safety determination, or compliance certification.

Common SB 326 questions

SB 326 sources and local rules

California Civil Code § 5551 sets the inspection and reporting requirements. California Civil Code § 4525 covers resale disclosures. Read the full SB 326 FAQ or find local rules for your property. For an apartment building outside a common interest development, check SB 721.

Start myPROJECT

Keep your building list, association records and access notes together. Share one clear scope with inspection providers so the board can compare quotes.