HOAs and condominiums
SB 326 balcony inspections
California law requires boards of covered condominium associations to arrange inspections of certain balconies, decks, stairs and walkways. The inspection checks the parts that support these structures and protect them from water. The board uses the report to respond to hazards, plan repairs and update its reserve study.
Does SB 326 apply to your building?
Condominium ownership and three or more attached homes
The building must be in a legally defined condominium project and contain at least three attached multifamily dwelling units. Count each building separately. Rental occupancy does not change condo ownership.A qualifying element the association maintains or repairs
Check who is responsible for the structural supports and waterproofing under the association’s governing documents. A balcony can be for one resident’s use and still be the association’s responsibility. Check the SB 326 coverage criteria.
Which balconies, stairs and decks count?
Under SB 326, an Exterior Elevated Element, or E3, includes the load-bearing parts and the waterproofing that protects them. The structural parts extend beyond the exterior walls and transfer loads from decks, balconies, stairways, walkways and their railings back to the building. The structure must meet these conditions:
- Its walking surface is more than six feet above ground level.
- People are meant to use it.
- Wood or wood-based products provide all or a substantial part of its support.
The surface can hide the frame below. Check the plans or have a qualified professional verify the support material. Read the SB 326 definition and check local rules for requirements that cover other structures or materials.
When is the inspection due?
Existing buildings
The general first deadline was January 1, 2025. Repeat the inspection at least every nine years in coordination with the reserve study inspection. If the association missed its deadline, arrange the inspection promptly.Newer buildings
If the building permit application was submitted on or after January 1, 2020, the first inspection is due within six years after the certificate of occupancy. Check the property’s records and any stricter local rules.
Who can inspect and how do they select the sample?
The board must hire a California-licensed architect, civil engineer, or structural engineer. Use the official directories to check an architect license with CAB or check a civil or structural engineer license with BPELSG. Inspector qualifications.
Before the first inspection, the inspector creates a random list of the locations of each type of qualifying element the association maintains or repairs. The association keeps that list. At the next inspection, the inspector starts with the next element on the list and proceeds in order.
The sample must provide 95% confidence that the results reflect the full group, with a margin of error of no more than five percentage points in either direction. Ask the inspector to explain the inventory, sample size and selection method in the proposal. See how the SB 326 sample works.
The inspector starts with the least intrusive visual method needed to check the supports. That can include a moisture meter, a small camera or infrared imaging. If the inspector sees signs that water or water vapor entered the waterproofing system and could damage the supports, they decide whether and how to inspect further.
What happens after the inspection?
Immediate danger
The inspector sends the report to the association as soon as it is complete and to local enforcement within 15 days after completion. The association must take preventive measures immediately. Keep occupants out until the local enforcement agency inspects and approves the repairs.Repairs without immediate danger
Use the report to set priorities, arrange repairs with contractors licensed for the materials and work and plan funding. SB 326 gives no fixed statewide number of days for completing these repairs. Confirm the schedule with the inspector and check for local permits or deadlines. Keep maintaining the elements between inspections.
Keep records for the board, owners and buyers
What the board should gather before asking for quotes
Plan your inspection budget
Prepare before you request a quote
Start with location, role, and known elements
Keep this short. Enter a California city or ZIP, choose the role or question, then add only the element categories you know.
Counts should cover the project. The inspection count is the minimum number of elements to plan around for this request.
?
SB 721 uses ceil(total same-type elements x 0.15). SB 326 uses Z = 1.96, e = 0.05, and p = 0.5 when unknown. Section 604 and other request types use the total entered here. This is quote-planning support, not a final inspection plan or legal advice.
Add only the categories you know. Leave unknown element types out for now.
Show count assumptions
| Type | Entered | Estimated inspected |
|---|---|---|
| Balconies | 0 | 0 |
| Decks | 0 | 0 |
| Stairs | 0 | 0 |
| Landings | 0 | 0 |
| Walkways | 0 | 0 |
| Rails | 0 | 0 |
| Fire escapes | 0 | 0 |
The count assumption is not a price. Public sources do not support a reliable market price for every element type yet. A real quote still depends on provider pricing, access, building layout, local process, reporting scope, and whether the inspector expands the sample.
This is not a provider quote, regulated fee schedule, market average, legal advice, engineering advice, safety determination, or compliance certification.