What to do after a balcony inspection

Start with the findings and recommendations. Find out what needs attention now, what needs a repair, and what needs another look. Then use the same report pages and photos to ask each contractor to price the same work.

Step 1: Read the findings before you ask for quotes

The report identifies an immediate hazard

Keep people away from the affected area. Follow the inspector’s directions, notify residents who use the area, and contact the local building or code enforcement office promptly. Call 911 if someone is in immediate danger. Keep the area closed until you have the required clearance to reopen it. What to do if the report finds an immediate hazard.

The report calls for repairs or a closer look

Ask the inspector to identify each location, what must be repaired, and what is still unknown. If the report calls for opening a covered area or for an engineer’s review, include that in the request. Ask which repairs need drawings, a permit or a follow-up inspection, and confirm deadlines with the building department.

The report lists maintenance only or no work

Save the signed report, note the next inspection date, and schedule any recommended maintenance. If the report is unclear about an item, ask the inspector to explain it in writing. What to do after receiving the report.

Step 2: Give every contractor the same repair request

Send the same information to each contractor. Match contractor licenses to the wood, steel, concrete and waterproofing work, then verify each business’s license. Keep the original report in your records and remove resident names, phone numbers and access codes from the copy you share.

  1. Location and count. Give the building, level and location of each item in the report: for example, “Building B, second-floor walkway, outside Unit 204.” Include the same location label on each photo.
  2. Report findings. Share the relevant pages, marked photos and required repairs. Include plans, the permit or violation notice, and any deadlines if you have them.
  3. Access and protection. Explain how workers can reach the area, which routes must stay open, and when residents need notice. Take photos only from a safe place.
  4. A price you can compare. Ask for separate prices for opening and restoring finishes, structural repairs, waterproofing, and any permits or final inspections. Ask what is excluded and how the contractor will price concealed damage, such as damaged wood found after a cover is removed. Require written approval before extra work begins.

How to compare repair quotes · What to gather for a repair quote

What to photograph for a repair quote

These photos from one apartment building show why a wide photo and a close-up are useful. They show visible conditions only; the inspector’s findings determine what needs repair.

Start with a wide view. It shows where the worn and peeling areas sit under the walkway. Ask the inspector which boards carry weight and whether the area above needs a closer look.
Show the damage up close. Mark the split and broken edge on the report photo. Ask how much wood is affected and whether the part needs repair or replacement.
Show the steps from a safe position. Ask whether the work is limited to the stair treads or also includes the supports and the connection at the wall.
Show where parts meet. This view shows the railing bracket and the sloped wood support. Ask whether the repair covers the support, the railing connection or both.

What dry rot is · Early signs of failed waterproofing · Stair and framing terms

Step 3: Check your deadlines and keep the final records

Check the dates before you schedule repairs

  • SB 721: For nonemergency repairs, the owner generally has 120 days from receipt of the report to apply for a permit and 120 days from permit approval to complete the repairs. Check whether the local agency has set other requirements or granted an extension. SB 721 report and repair FAQ.
  • SB 326: Do not use the SB 721 dates for an HOA. If the report identifies an immediate threat, the association must take preventive measures immediately and keep occupants out until the local enforcement agency inspects and approves the repairs. For other findings, ask the inspector and the local authority what schedule, permits or orders apply. SB 326 report and follow-up FAQ.

Check any city or county notice for filing steps and dates. Find local rules.

Keep the record of what was done

Save the report, approved scope, permit and final inspection record if required. Add photos of the work before it was covered and any written sign-off. Ask who must check the repairs, who files the paperwork, and who clears any access restriction. How to prepare for a repair reinspection.